Four Post Lift: Weekly Maintenance (every 40-Hours)
Form Template
Occupational Safety and Health Administration (OSHA) and the American National Standards Institute (ANSI) require users to inspect lifting equipment at the start of every shift.
5,000 Companies save time and money with GoCanvas
These and other periodic inspections are the responsibility of the user. To avoid personal injury and/or property damage, permit only trained personnel to operate lift. The periodic maintenance given in the Four Post Lift: Weekly Maintenance (every 40-Hours) mobile app is the suggested minimum requirements and minimum intervals; accumulated hours or time period, whichever comes sooner. No need to number crunch GoCanvas can perform the calculations for you!
Not quite right?
GoCanvas accounts come
with hundreds of form templates
Don't take our word for it...
“I’m not a tech guy and I was able to pick this thing up in probably an hour, and actually start to build apps. I’ve done them over lunch when I’ve gotten frustrated with a process that didn’t exist in our company. So for non tech people who’ve got a problem, the support here is awesome and I’d recommend it to anybody, not just in our industry.”