Pipe Bursting of Potable Water Mains: Method Outline for Pre- and Post-Chlorination of HDPE Pipe
It is strongly recommends that public water systems (PWS) intending to use this pipe replacement technique - pipe bursting of potable water mains using pre-chlorinated high density polyethylene (HDPE) pipe - develop and implement written project requirements based on this app; there are no state regulations specific to use of this technique.
5,000 Companies save time and money with GoCanvas
For purposes of this guidance, city, town, or private utility are terms used inter-changeably. They all refer to the owner of the system. The owner, based on a set of engineering drawings, selects a contractor, the party performing the work, to install the piping in accordance with designed plans and specifications of an engineer. Assuming all qualifications for skill and materials are met, the methods outlined in the operational guide Pipe Bursting of Potable Water Mains Using Pre- and Post-Chlorinated Pipe shall be applied to each pipe section. The processes in the Pipe Bursting of Potable Water Mains: Method Outline for Pre- and Post-Chlorination of HDPE Pipe mobile app may be performed in series or in parallel with other sections of pipe within the job.
GoCanvas accounts come
with hundreds of form templates
Don't take our word for it...
“I’m not a tech guy and I was able to pick this thing up in probably an hour, and actually start to build apps. I’ve done them over lunch when I’ve gotten frustrated with a process that didn’t exist in our company. So for non tech people who’ve got a problem, the support here is awesome and I’d recommend it to anybody, not just in our industry.”