Lever Operated Chain Hoist: Preoperational Procedures
The Lever Operated Chain Hoist: Preoperational Procedures mobile app provides important information for personnel involved with the installation, operation and maintenance of this product.
5,000 Companies save time and money with GoCanvas
Although you may be familiar with this or similar equipment, it is strongly recommended that you read this manual before installing, operating or maintaining the product. A chain stopper link must be installed on the second to last chain link on the no-load end of the load chain. Verify that the load chain is not twisted or tangled prior to operating the hoist. Make sure the bottom hook on the 6 (LB060) and 9 (LB090) Ton multiple fall hoists is not capsized. Correct all chain irregularities before conducting the first hoist operation. Prior to attaching the hoist ensure that all attachment points, suspension components and supporting structure are adequate to support the hoist and its load. If necessary consult a professional that is qualified to evaluate the adequacy of the suspension location and its supporting structure
GoCanvas accounts come
with hundreds of form templates
Don't take our word for it...
“I’m not a tech guy and I was able to pick this thing up in probably an hour, and actually start to build apps. I’ve done them over lunch when I’ve gotten frustrated with a process that didn’t exist in our company. So for non tech people who’ve got a problem, the support here is awesome and I’d recommend it to anybody, not just in our industry.”